STANTON SPORT
AVIATION |
STANTON AIRFIELDSTANTON, MINNESOTA USA |
|
|
|
|
|
|
NEW! -Construction at Stanton July 2005 |
|
|
|
|
|
Ensign Hangars |
|
CONSTRUCTION VIEWS – Stanton, Minnesota
|
CLICK PHOTOS TO ENLARGE |
|
The Ready-Mix truck came and we
poured 6 footings, 3 per building.
Total of 1.6 cubic yards ($180) consumed. Thanks to Mark Cleare and Tom Kuhfeld. |
|
|
After smoothing the concrete,
the anchor bolts and associated jig were placed and centered over the witness
lines using a 2x4 as a spacer. The
jig was leveled precisely and let to set. The entire process was over in 45
minutes with 3 people. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|